Water Management Program

The Water Management Program supports various activities in the field of water management. In the 2025 water reform call, non-construction related development work and studies that help implement the strategic roadmap for water entrepreneurship reform 2025–2035 or prepare for the takeover of public water supply and sewerage service areas are supported. In the 2026 call, support was given for wastewater treatment and drinking water supply, small wastewater collection areas, remediation of residual pollution, mitigation of pollution sites, as well as non-construction related development work and studies.

AgencyKIK
Regionother
CountryEE
Legal formCompany, NGO, Government organization, Other
Start date5 Nov 2025
Max fundingIn the 2025 second (water reform) call, the maximum budget for a single application is 400,000 euros including own contribution., In the 2026 call, the maximum grant per application in the drinking water supply and wastewater treatment, as well as in the small wastewater collection areas subprogram, was 1,000,000 euros., In the 2026 call, the maximum amount of support for building a pre-treatment facility for industrial and production companies was 200,000 euros., In the 2026 call, an entrepreneur could not apply for more than 400,000 euros for the elimination of residual pollution.
BudgetThe total grant amount for the second (water reform) call of 2025 is 1,500,000 euros. The total grant amount for the 2026 water management program call was 2,500,000 euros.
Coverage

In the 2025 second (water reform) call, companies must have at least 50% own contribution.

A public legal person, such as a university, must have at least 20% own contribution.

A local government unit, non-profit association or foundation must have at least 20% own contribution.

A state agency must have at least 0% own contribution.